Our Responsibilities
At the time, this was SMD’s biggest project to date. The first phase consisted of a traditional two-storey teaching block and reception block extension, which included the installation of astroturf play areas. The buildings provided students with new classrooms, such as a SEN room, food technology suite and sound-proofed music room.
The second phase focused on the refurbishment of an existing building, marrying the new reception extension to the original school building. This was followed by the associated external works including a MUGA, new car park, play area, pond and cycle shelter.
During the project, phasing and logistics had to be completely re-visited to accommodate the school’s handover and usage requirements. This was led and coordinated by SMD. There was also a substantial increase in scope to the existing school which required additional planning and resources.
SMD presented a significant value engineering exercise to omit structural building fabric works, which saved the project time, money and risk.