Our Responsibilities
During the project, there was a need to expand development across the site to accommodate intake from another local school. This resulted in an extensive redesign of existing buildings, external works, and incoming services infrastructure. The original single-storey teaching block was developed into a two-storey building, and existing parts of the school were repurposed to maintain high-quality education and support provision.
The new two-storey building consisted of an off-site manufactured structural insulated panel (SIP) frame and structure. SMD not only assisted with the redesign of the teaching block, construction of the sports block and associated external works, but also supported the coordination of master plan phasing, costings, logistics, safeguarding, and health and safety.
The project was within a live school environment with external lettings, so regular communication and coordination needed to be maintained at all stages.